{"data":[{"attachment_id":"97f31838-c2cf-4101-abf8-0e1e5f2bcb91","title":"Connected Centers Plan (2019)","version":1,"status":"published","authored_at":"2026-11-18T12:24:43.818Z","change_kind":"initial","change_note":"Every sentence and label passed the quotation checks and the independent review.","analysis":{"claims":[{"id":"c1","note":"","text":"The plan estimates that new streets across 11 Jade District blocks would total roughly 4,200 centerline feet and cost roughly $5M.","quote":"If street\nconnections are built in each of the 11 blocks,\nthis would equate to roughly 4,200 centerline\nfeet of new roadway constructed. The cost to\nbuild these 11 blocks is roughly $5M, based\non the rate charged to developers on under-\nimproved local traffic streets without a curb\nfor frontage is consistent with PBOT’s Local\nTransportation Infrastructure Charge.","locator":"page 52","verdict":"cited","evidence":[],"sourceNamed":"PBOT’s Local\nTransportation Infrastructure Charge"},{"id":"c2","note":"","text":"The plan estimates that new streets across seven Rosewood blocks would total roughly 3,225 centerline feet and cost roughly $3.87M.","quote":"If street connections are built in each\nof the seven blocks, this would equate to roughly\n3,225 centerline feet of new roadway constructed.\nIn some cases, specifically Connection Opportunity\nArea #2 and #3, the required connection\nwould include a rear-lot dedication and street\nimprovement to link two dead-end public rights-\nof-way. The cost to build these seven blocks is\nroughly $3.87M (based on the LTIC rate).","locator":"page 52","verdict":"cited","evidence":[],"sourceNamed":"LTIC"},{"id":"c3","note":"","text":"The plan says PBOT lacked a funding source to acquire property for new connections at the time and depended on connections built through infill development.","quote":"PBOT does not\ncurrently have a funding source available to\npurchase properties or acquire private property\nand remains dependent on connections being\nmade as infill development occurs.","locator":"page 5","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c4","note":"","text":"The plan says Portland City Code requires streets at maximum intervals of 530 feet and requires a new street when development occurs where spacing exceeds that standard.","quote":"According to Portland City Code (33.654.110 and\n17.88.040), streets must be spaced at maximum\nintervals of 530 feet. If development occurs in a\nlocation where the street spacing exceeds this\nstandard, a new street must be built.","locator":"page 10","verdict":"cited","evidence":[],"sourceNamed":"Portland City Code"},{"id":"c5","note":"","text":"The plan says projections anticipated 260,000 additional Portland residents by 2035, beyond the 620,000 residents it described as living there.","quote":"According to projections,\n260,000 new residents will be added to the\n620,000 people who currently live here by the\nyear 2035.","locator":"page 7","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c6","note":"","text":"The plan says the 2035 Comprehensive Plan aims to direct 80% of growth to centers, including downtown, and corridors.","quote":"The 2035 Comprehensive Plan, the\nCity’s guide for accommodating this growth, aims\nto focus 80% of the growth in centers (including\ndowntown) and along corridors in an effort to\nincrease density where there are destinations,\nservices and good access to transit, bike and\npedestrian infrastructure.","locator":"page 7","verdict":"cited","evidence":[],"sourceNamed":"2035 Comprehensive Plan"},{"id":"c7","note":"","text":"The plan says only one new street connection was built in Gateway Town Center during fourteen years of development after its first master street plan was adopted.","quote":"The issue of developers avoiding lots where\nnew connections are needed is illustrated in\nthe Gateway Town Center, where master street\nplans show the location of several needed new\nstreet connections. Despite fourteen years of\ndevelopment that has occurred since the first\nGateway master street plan was adopted, only\none new connection has been built.","locator":"page 11","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c8","note":"","text":"The plan says around 70% of Jade District parcels are less than 80 feet wide.","quote":"Around 70% of parcels in the\nJade District are less than 80 feet in width.","locator":"page 26","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c9","note":"","text":"The plan says nearly 58% of Rosewood parcels have frontages less than 80 feet wide.","quote":"Parcels in the Rosewood Neighborhood were\nplatted with slightly wider frontages than those in\nthe Jade District. Nonetheless, nearly 58% of the\nparcels have frontages that are less than 80 feet in\nwidth.","locator":"page 27","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c10","note":"","text":"The plan says most Rosewood blocks measure 600 x 1000 feet, putting street spacing out of compliance with City Code in both directions throughout the neighborhood.","quote":"Most blocks in Rosewood\nare 600 x 1000 feet. This means that street spacing\nis out of compliance with City Code in both the\neast-west direction and the north-south direction\nthroughout the neighborhood.","locator":"page 16","verdict":"cited","evidence":[],"sourceNamed":"City Code"}],"summary":[{"id":"s1","text":"The street plan says the Portland Bureau of Transportation is working to improve street connections in the Jade District and Rosewood neighborhoods.","citations":[{"quote":"the Portland Bureau of Transportation (PBOT)\nis working with the Bureau of Planning and\nSustainability (BPS) to improve street connectivity\nin Jade and Rosewood, explore revisions to the\nCity’s zoning code development standards, and\nrevise design standards that shape development in\nPortland’s multi-dwelling zones.","locator":"page 4","sourceId":"file-97f31838-c2c"}]},{"id":"s2","text":"The plan proposes allowing streets to be built in stages where narrow properties cannot accommodate a full-width street.","citations":[{"quote":"The plan proposes allowing new\nstreets to be built incrementally (or phases) in\nlocations where sites are narrow, and the right-of-\nway needed for a full width street is not available.","locator":"page 5","sourceId":"file-97f31838-c2c"}]},{"id":"s3","text":"It also proposes development-charge credits and funding to help pay for new public streets and paths.","citations":[{"quote":"the Connected\nCenters Street Plan identified the blocks\nthat are most crucial for connectivity and\nseeks to help reduce the burden on sites\nwhere a new public street or pathway is\nrequired by providing Transportation System\nDevelopment Charge (TSDC) incentives,\nspecifically potential TSDC credit and TSDC\ncapital funding.","locator":"page 51","sourceId":"file-97f31838-c2c"}]}]},"prompt_version":"file-check-v1","model":"gpt-6-astra","authored_by":"codex_subscription_verified","is_current":true}],"notice":"Automated summaries and source checks by Portland Civic Lab. No person reviewed them before publication. Labels compare a file with the rest of the official record and do not judge whether a statement is true. Replaced and withdrawn versions are retained."}