{"data":[{"attachment_id":"856cc5b0-cae9-4bce-8c6e-bde3661457fe","title":"Exhibit A","version":1,"status":"published","authored_at":"2026-11-16T17:20:37.368Z","change_kind":"initial","change_note":"Every sentence and label passed the quotation checks and the independent review.","analysis":{"claims":[],"summary":[{"id":"summary-1","text":"Exhibit A presents proposed changes to Portland's marijuana licensing code, including rules for deferred license fee payments.","citations":[{"quote":"Exhibit A\nChapter 14B.130 Marijuana Regulatory License Procedure and Requirements","locator":"page 1","sourceId":"file-856cc5b0-cae"},{"quote":"Applicant may request a license fee deferred payment plan by submitting a form provided by the\nPortland Permitting & Development to demonstrate financial need.","locator":"page 1","sourceId":"file-856cc5b0-cae"}]},{"id":"summary-2","text":"The exhibit also proposes changes to restrictions on sales through drive-through facilities and walk-up windows.","citations":[{"quote":"3. Licensee must not make marijuana or marijuana items available for sale from a vendor cart, temporary\nstructure, or satellite location. , or through exterior openings of the licensed premises, such as drive-thru\nfacilities or walk-up windows.","locator":"page 3","sourceId":"file-856cc5b0-cae"}]}]},"prompt_version":"file-check-v1","model":"gpt-6-astra","authored_by":"codex_subscription_verified","is_current":true},{"attachment_id":"ca040970-20f5-4465-890a-d52050d84b91","title":"Presentation (November 10, 2026)","version":1,"status":"published","authored_at":"2026-11-16T15:22:08.865Z","change_kind":"initial","change_note":"1 statement withheld: c2: The conflict label is not established because presentation page 4 describes a previous fee-schedule down payment of $500, while record impact:purpose describes a current code requirement of $600, without establishing the same period and scope.","analysis":{"claims":[{"id":"c1","note":"","text":"The slides list the current annual license fee as $3,970.","quote":"• Current annual license fees: $3,970","locator":"page 3","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c3","note":"The slides describe a threshold of 14 days late, while Exhibit A shows a proposed threshold of 10 days.","text":"The slides describe a proposed change in the late-fee threshold from 30 days late to 14 days late.","quote":"• Updated late fees\n• Adjusting from 30 days late to 14 days late.","locator":"page 4","verdict":"conflict","evidence":[{"quote":"d.c. For all other license types, payments made Failure to pay any license fee up to 30 10 days after\nthe six-month due date must include a late fee of $250. will require the licensee to pay the late fee\nspecified in the fee schedule adopted by Council.","locator":"page 1","sourceId":"file-856cc5b0-cae"}],"sourceNamed":null},{"id":"c4","note":"","text":"The slides report a 31% participation rate in the deferred payment program.","quote":"• Popular program: 31% participation rate.","locator":"page 5","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c5","note":"","text":"The slides say a significant number of licensees miss payment of their remaining balance after the deferral period ends.","quote":"• Challenges with a significant number of licensees missing payment of\nremaining balance after deferral window ends.","locator":"page 5","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c6","note":"","text":"The slides say the payment program requires an initial down payment and payment of the remaining balance within 6 months.","quote":"• Requires initial down payment with remainder of balance due within 6\nmonths.","locator":"page 3","verdict":"supported","evidence":[{"quote":"Under the current code, licensees are required to make a $600 down payment toward the cost of their license, with the remaining balance due within six months.","locator":"impact:purpose","sourceId":"record"}],"sourceNamed":null},{"id":"c7","note":"","text":"The slides say state regulations have permitted existing drive-thru and walk-up windows since 2020.","quote":"• Remove outdated language prohibiting drive-thru and walk-up\nwindows that are already incorporated into a building.\n• The restriction was originally modeled after Oregon state law.\n• State regulations have permitted these features since 2020.","locator":"page 7","verdict":"supported","evidence":[{"quote":"Original PCC Chapter 14B.130 language prohibited marijuana retailers from using drive-through and walk-up windows, mirroring State requirements. In response to COVID-19, OLCC temporarily allowed curbside pickup and delivery, including use of these windows, in March 2020. Permanent rules adopted in September 2020 continued to allow on-site delivery.","locator":"description","sourceId":"record"}],"sourceNamed":null},{"id":"c8","note":"","text":"The slides say the City has allowed deferred payment of annual licensing fees since 2018.","quote":"• City has allowed deferred payment of annual licensing fees since 2018","locator":"page 3","verdict":"supported","evidence":[{"quote":"On September 26, 2018, City Council adopted Ordinance No. 189183, establishing the License Fee Reduction Program and Deferred Payment Program.","locator":"description","sourceId":"record"}],"sourceNamed":null},{"id":"c9","note":"","text":"The slides report increased administrative burdens and collection efforts in the deferred payment program.","quote":"• Challenges with a significant number of licensees missing payment of\nremaining balance after deferral window ends.\n• This has increased administrative burdens and collection efforts.","locator":"page 5","verdict":"supported","evidence":[{"quote":"The Deferred Payment Program has experienced significant abuse, resulting in increased administrative burden and collection efforts.","locator":"impact:purpose","sourceId":"record"}],"sourceNamed":null}],"summary":[{"id":"s1","text":"This is a Portland Permitting & Development presentation to the City Life Committee about proposed changes to cannabis licensing requirements.","citations":[{"quote":"Amend Marijuana Regulatory\nLicense Procedure and\nRequirements (PCC 14B.130)\nCity Life Committee\nNovember 10, 2026\nChristina Coursey\nCannabis & Liquor Program Manager\nPortland Permitting & Development\nEric Kutch\nDirector\nPortland Permitting & Development","locator":"page 1","sourceId":"file-ca040970-20f"}]},{"id":"s2","text":"The slides describe proposed updates to down payments and late fees, removal of fixed dollar amounts from the code, and permission for existing drive-thru and walk-up windows.","citations":[{"quote":"• Increased required down payment from $500 to 50%\n• Updated late fees\n• Adjusting from 30 days late to 14 days late.\n• Removal of 60 day second late fee.\n• Remove specific dollar amounts from the City Code 14B.130","locator":"page 4","sourceId":"file-ca040970-20f"},{"quote":"• Remove outdated language prohibiting drive-thru and walk-up\nwindows that are already incorporated into a building.","locator":"page 7","sourceId":"file-ca040970-20f"}]}]},"prompt_version":"file-check-v1","model":"gpt-6-astra","authored_by":"codex_subscription_verified","is_current":true}],"notice":"Automated summaries and source checks by Portland Civic Lab. No person reviewed them before publication. Labels compare a file with the rest of the official record and do not judge whether a statement is true. Replaced and withdrawn versions are retained."}