{"data":[{"attachment_id":"bd1fb91e-c3ce-41b0-97fd-ad999e482daa","title":"Committee Staff Summary","version":1,"status":"published","authored_at":"2026-11-18T03:23:31.885Z","change_kind":"initial","change_note":"1 statement withheld: c4: The subject's page 2 passage explicitly links these improvements to the named Safer Outer Stark safety plan, making the unsourced label insufficiently established.","analysis":{"claims":[{"id":"c1","note":"","text":"The summary says safety improvements at SE 119th Avenue and SE Stark Street require temporary permission to use property for construction.","quote":"Safety improvements at the intersection of SE 119th Avenue and SE Stark Street require a temporary\nconstruction easement.","locator":"page 2","verdict":"supported","evidence":[{"quote":"Easement acquisitions are required from two (2) property owners,\nconsisting of two (2) temporary construction easements that will\nsupport construction activities.","locator":"page 6","sourceId":"file-7ad42f26-de8"},{"quote":"Easement Locations – SE Stark St and SE 119th Ave","locator":"page 7","sourceId":"file-7ad42f26-de8"}],"sourceNamed":null},{"id":"c2","note":"","text":"The summary says the current safety plan phase includes pedestrian crossing improvements at six intersections with higher crash history.","quote":"The current phase of the Safer Outer Stark safety plan includes pedestrian crossing improvements at six\nintersections with higher crash history: SE 111th and Stark; SE 119th and Stark; SE 128th and Stark; SE 137th\nand Stark; SE 141st and Stark; and SE 151st and Stark.","locator":"page 2","verdict":"supported","evidence":[{"quote":"PBOT was awarded a grant through the ODOT All Roads Transportation Safety (ARTS)\nProgram as part of the 2024-2027 funding cycle to address high incidence of pedestrian\nand turning crashes on SE Stark between SE 108th and SE 162nd.\nProject scope for this ARTS project includes enhanced pedestrian crossings at six key\nintersections on SE Stark (SE 111th, 119th, 128th, 137th 141st and 151st).","locator":"page 2","sourceId":"file-7ad42f26-de8"}],"sourceNamed":null},{"id":"c3","note":"","text":"The summary says Outer SE Stark Street is among the 30 streets and intersections with the most serious crashes.","quote":"Outer SE Stark Street is part of the City’s High Crash Network, and is among the 30 streets and\nintersections with the most serious crashes.","locator":"page 2","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c5","note":"","text":"The summary says planned construction includes accessible curb ramps, pedestrian crossing islands, improved signs and striping, and drainage and utility updates.","quote":"At these intersections, the Portland Bureau of\nTransportation will construct ADA compliant curb ramps, pedestrian crossing islands, enhanced signing\nand striping, and updated drainage and utility components.","locator":"page 2","verdict":"supported","evidence":[{"quote":"The SE Stark St: 111th - 151st Ave Project (the \"Project\") will construct improved ADA compliant curb ramps, pedestrian crossing islands, enhanced signing and striping, and updated drainage and utility components.","locator":"impact:purpose","sourceId":"record"}],"sourceNamed":null},{"id":"c6","note":"","text":"The summary says the City can exercise eminent domain under Section 9-108 of the City Charter using procedures in Oregon Revised Statutes (ORS) Chapter 35.","quote":"The City is\nauthorized to exercise the power of eminent domain under Section 9-108 of the City Charter and in\naccordance with the procedures outlined in Oregon Revised Statutes (ORS) Chapter 35.","locator":"page 2","verdict":"supported","evidence":[{"quote":"The City of Portland may exercise the power of eminent domain pursuant to Section 9-108 of the City Charter and in accordance with Eminent Domain procedures provided for in ORS Chapter 35 (Eminent Domain; Public Acquisition of Property), including those procedures that apply to notification, valuation, negotiation, relocation and early possession if necessary, when the exercise of such power is deemed necessary by the City Council to accomplish public purposes for which the City has responsibility.","locator":"impact:purpose","sourceId":"record"}],"sourceNamed":null},{"id":"c7","note":"","text":"The summary says ORS 35.235 requires Council adoption of an ordinance to acquire property for public purposes.","quote":"In accordance\nwith ORS 35.235, the acquisition of property for public purposes requires the adoption of an ordinance by\nthe Council.","locator":"page 2","verdict":"cited","evidence":[],"sourceNamed":"ORS 35.235"},{"id":"c8","note":"","text":"The summary says no verbal or written testimony was submitted before the committee acted.","quote":"No verbal or written testimony was submitted on this item prior to committee action.","locator":"page 2","verdict":"unsourced","evidence":[],"sourceNamed":null}],"summary":[{"id":"s1","text":"This Public Works Committee staff summary describes an ordinance authorizing the City to acquire temporary property rights for intersection improvements.","citations":[{"quote":"COMMITTEE STAFF SUMMARY\nPublic Works Committee","locator":"page 1","sourceId":"file-bd1fb91e-c3c"},{"quote":"The ordinance (document number 2026-335) authorizes the Portland Bureau of Transportation (PBOT) to\nacquire certain temporary property rights necessary for intersection improvements at SE 119th Avenue and\nSE Stark Street through exercise of the City’s eminent domain authority","locator":"page 1","sourceId":"file-bd1fb91e-c3c"}]},{"id":"s2","text":"The summary says the City can negotiate payment for those rights and seek a court decision if negotiations fail.","citations":[{"quote":"The ordinance grants PBOT and the City Attorney’s Office the authority to negotiate and offer just\ncompensation for the required property interests. If negotiations are unsuccessful, the ordinance\nauthorizes the initiation of condemnation proceedings to determine just compensation through the\njudicial process.","locator":"page 1","sourceId":"file-bd1fb91e-c3c"}]},{"id":"s3","text":"It records a committee recommendation to pass the ordinance.","citations":[{"quote":"Action: Referred to City Council with the recommendation it be passed","locator":"page 1","sourceId":"file-bd1fb91e-c3c"}]}]},"prompt_version":"file-check-v1","model":"gpt-6-astra","authored_by":"codex_subscription_verified","is_current":true},{"attachment_id":"00e662bb-65b1-48c0-9b0d-530ddc87afd7","title":"Exhibits 1 - 4","version":1,"status":"published","authored_at":"2026-11-18T08:21:15.313Z","change_kind":"initial","change_note":"Every sentence and label passed the quotation checks and the independent review.","analysis":{"claims":[{"id":"c1","note":"","text":"The exhibit lists a temporary construction easement covering 65 square feet.","quote":"Containing 65 square feet.","locator":"page 1","verdict":"supported","evidence":[{"quote":"Address\nZoning\nSq Ft\n11827 SE Stark R7 65\n11917 SE Stark R7 63","locator":"page 7","sourceId":"file-7ad42f26-de8"}],"sourceNamed":null},{"id":"c2","note":"","text":"The exhibit lists a temporary construction easement covering 63 square feet.","quote":"Containing 63 square feet.","locator":"page 3","verdict":"supported","evidence":[{"quote":"Address\nZoning\nSq Ft\n11827 SE Stark R7 65\n11917 SE Stark R7 63","locator":"page 7","sourceId":"file-7ad42f26-de8"}],"sourceNamed":null}],"summary":[{"id":"s1","text":"The exhibits give legal descriptions of temporary construction easements for the Stark Street project.","citations":[{"quote":"EXHIBIT A\nS.E. STARK STREET – S.E. 111TH TO S.E. 151ST AVENUE\nR/W # 9840-01\nTEMPORARY CONSTRUCTION EASEMENT","locator":"page 1","sourceId":"file-00e662bb-65b"}]},{"id":"s2","text":"They describe one area of 65 square feet and another of 63 square feet.","citations":[{"quote":"Containing 65 square feet.","locator":"page 1","sourceId":"file-00e662bb-65b"},{"quote":"Containing 63 square feet.","locator":"page 3","sourceId":"file-00e662bb-65b"}]}]},"prompt_version":"file-check-v1","model":"gpt-6-astra","authored_by":"codex_subscription_verified","is_current":true},{"attachment_id":"7ad42f26-de81-48d3-a8c6-032c5608e82f","title":"Presentation","version":1,"status":"published","authored_at":"2026-11-18T06:27:45.468Z","change_kind":"initial","change_note":"Every sentence and label passed the quotation checks and the independent review.","analysis":{"claims":[{"id":"c1","note":"","text":"The slides list a $2.3 million total project budget, including $1.3 million in federal funding and $1.0 million in local funding.","quote":"Federal (ODOT ARTS Grant): $1.3 million\nLocal Funding (GTR, FOS): $1.0 million\nTotal Project Budget: $2.3 million","locator":"page 4","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c2","note":"","text":"The slides list temporary construction easements measuring 65 and 63 square feet.","quote":"Temporary\nConstruction\nEasements\nshown in green\nAddress\nZoning\nSq Ft\n11827 SE Stark R7 65\n11917 SE Stark R7 63","locator":"page 7","verdict":"supported","evidence":[{"quote":"Containing 65 square feet.","locator":"page 1","sourceId":"file-00e662bb-65b"},{"quote":"Containing 63 square feet.","locator":"page 3","sourceId":"file-00e662bb-65b"}],"sourceNamed":null},{"id":"c3","note":"","text":"The slides say the project includes enhanced pedestrian crossings at six intersections on SE Stark.","quote":"Project scope for this ARTS project includes enhanced pedestrian crossings at six key\nintersections on SE Stark (SE 111th, 119th, 128th, 137th 141st and 151st).","locator":"page 2","verdict":"supported","evidence":[{"quote":"The current phase of the Safer Outer Stark safety plan includes pedestrian crossing improvements at six\nintersections with higher crash history: SE 111th and Stark; SE 119th and Stark; SE 128th and Stark; SE 137th\nand Stark; SE 141st and Stark; and SE 151st and Stark.","locator":"page 2","sourceId":"file-bd1fb91e-c3c"}],"sourceNamed":null},{"id":"c4","note":"","text":"The slides schedule design engineering through summer 2027, bidding and award in fall 2027, and construction starting in spring 2028.","quote":"Project Schedule:\nDesign Engineering Phase: through summer 2027\nAd/bid/Award: fall 2027\nConstruction Start: spring 2028","locator":"page 4","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c5","note":"","text":"The slides say PBOT received an ODOT All Roads Transportation Safety (ARTS) Program grant in the 2024-2027 funding cycle to address pedestrian and turning crashes.","quote":"PBOT was awarded a grant through the ODOT All Roads Transportation Safety (ARTS)\nProgram as part of the 2024-2027 funding cycle to address high incidence of pedestrian\nand turning crashes on SE Stark between SE 108th and SE 162nd.","locator":"page 2","verdict":"unsourced","evidence":[],"sourceNamed":null},{"id":"c6","note":"","text":"The slides say Outer SE Stark is designated as a high crash corridor.","quote":"Outer SE Stark is designated as a high crash corridor.","locator":"page 2","verdict":"supported","evidence":[{"quote":"Outer SE Stark Street is part of the City’s High Crash Network, and is among the 30 streets and\nintersections with the most serious crashes.","locator":"page 2","sourceId":"file-bd1fb91e-c3c"}],"sourceNamed":null},{"id":"c7","note":"","text":"The slides say PBOT conducted an 18-month public engagement process to identify community priorities for corridor safety improvements.","quote":"PBOT conducted 18-month public\nengagement process between 2019 and\n2021 to identify community priorities for\nsafety improvements along the corridor.","locator":"page 5","verdict":"supported","evidence":[{"quote":"PBOT carried out an 18-month public engagement process in 2019–20, gathering input through an online survey and in person discussions with community members along the Stark Street corridor. This outreach highlighted concerns about speeding, unsafe crossings, gaps in sidewalk and transit access, and the need for better visibility along the corridor.","locator":"impact:community","sourceId":"record"}],"sourceNamed":null},{"id":"c8","note":"","text":"The slides say PBOT has worked on safety for all modes of travel along the corridor since 2018.","quote":"PBOT has been working to address\nsafety for all modes on the corridor since 2018.","locator":"page 2","verdict":"unsourced","evidence":[],"sourceNamed":null}],"summary":[{"id":"s1","text":"This transportation presentation describes pedestrian crossing improvements at six intersections on SE Stark.","citations":[{"quote":"Project scope for this ARTS project includes enhanced pedestrian crossings at six key\nintersections on SE Stark (SE 111th, 119th, 128th, 137th 141st and 151st).","locator":"page 2","sourceId":"file-7ad42f26-de8"}]},{"id":"s2","text":"The slides list a $2.3 million project budget and construction starting in spring 2028.","citations":[{"quote":"Construction Start: spring 2028\nFunding:\nFederal (ODOT ARTS Grant): $1.3 million\nLocal Funding (GTR, FOS): $1.0 million\nTotal Project Budget: $2.3 million","locator":"page 4","sourceId":"file-7ad42f26-de8"}]},{"id":"s3","text":"They say PBOT seeks temporary construction easements from two (2) property owners, with condemnation possible if negotiations fail.","citations":[{"quote":"• Easement acquisitions are required from two (2) property owners,\nconsisting of two (2) temporary construction easements that will\nsupport construction activities.\n• PBOT is seeking authority to initiate negotiations and extend offers\nof just compensation to property owners for acquisition of\nnecessary easements. If negotiations are unsuccessful, the City\nmay proceed with condemnation to obtain these easements.","locator":"page 6","sourceId":"file-7ad42f26-de8"}]}]},"prompt_version":"file-check-v1","model":"gpt-6-astra","authored_by":"codex_subscription_verified","is_current":true}],"notice":"Automated summaries and source checks by Portland Civic Lab. No person reviewed them before publication. Labels compare a file with the rest of the official record and do not judge whether a statement is true. Replaced and withdrawn versions are retained."}