Emergency ordinance2025-285

Approve findings to authorize exemption to the competitive bidding requirements and authorize competitive solicitation for the use of the alternative contracting method…

The path so far

Each stop is a meeting in the official record, with the City’s own words for what happened.

  1. Referred to City CouncilMeeting guide
  2. PassedMeeting guide
  3. Where it standsFinal Council action complete
  4. After the decisionFollow-through is not tracked yetA final vote is not the same as the work being done.

In brief

From the official impact statement

The Burgard Bridge Resiliency and Multimodal Enhancements Project will replace the existing viaduct over the Union Pacific Railroad that was constructed in 1930 in the St. Johns neighborhood of Portland, Oregon. This bridge provides a critical connection to area residents and industries, serving all transportation modes and providing an integral link through the North Portland peninsula to other areas of the City, including the Rivergate Industrial District. CM/GC is the only delivery method that will allow PBOT to meet the FY22 Bridge Improvement Program grant requirement of obligating all funds by September 30, 2025. FHWA has indicated that 23 CFR 635.309(p)(1) allows…

Official impact statement

Decision details

From the official record
Who is affected

According to the demographic data approximately 90% of the population in the area speaks English and 10% speaks Spanish. All communications and materials will be translated into Spanish. We will be reaching out to residents, the Port of Portland and local businesses who frequently use the bridge. The project will not only replace the bridge but also improve bicycle and pedestrian access and upgrade the existing traffic signal north of the bridge. The project has support from the Freight industry, the Port of Portland, Union Pacific Railroad and all businesses in the area.

Official community impact statement
Financial impact

Total project cost is $17,369,096 (low confidence estimate), funded primarily with Federal grants and Heavy Vehicle Use Tax (HVUT). Costs for this project will be posted to PBOT Capital Project T01357.D42, which is included in PBOT’s FY 25-26 budget and five-year CIP forecast. This contract for this CM/GC is between $9,000,000 and $11,000,000 for the construction of the project. The estimate was derived from PBOT Engineering Services. There is no additional funding requested. Due to the federal grant requirements to spend the funds by December of 2029 the only option to complete the project on time is to use the CM/GC type contract.

Official financial impact statement
Prosper Portland analysis

An Economic and Real Estate Development Impact Analysis was not submitted for this proposed action. Pursuant to City Council Resolution 37664, Prosper Portland staff has reviewed the action and agree that it does not require an Economic and Real Estate Development Impact Analysis.

Economic and real estate development analysis, provided by Prosper Portland
City Budget Office analysis

The Burgard Bridge Resiliency and Multimodal Enhancement Project is estimated to cost $17.4 million, with $13.9 million in federal grant funding and $3.5 million in matching funds from the Heavy Vehicle Use Tax (HVUT). This ordinance authorizes the use of a Construction Manager/General Contractor (CM/GC) alternative contracting method to expedite delivery and meet federal deadlines, with the CM/GC contract estimated between $9 million and $11 million. All funds are included in PBOT’s FY 2025-26 budget and five-year Capital Improvement Plan. No additional resources are required.

Financial and budget analysis, provided by City Budget Office

Recorded action

Final Council action

Passed · 12–0

Final action on 2025-285: *Approve findings to authorize exemption to the competitive bidding requirements and authorize competitive solicitation for the use of the alternative contracting method of a Construction Manager/General Contractor for the ​Burgard Bridge Resiliency and Multimodal Enhancement Project

Sources & history

Documents1

Official title: *Approve findings to authorize exemption to the competitive bidding requirements and authorize competitive solicitation for the use of the alternative contracting method of a Construction Manager/General Contractor for the ​Burgard Bridge Resiliency and Multimodal Enhancement Project

Emergency ordinance 192085Final official action · Portland.gov
Read the full official text

The City of Portland ordains.Section 1. The Council finds:The Portland Bureau of Transportation applied to the Federal Bridge Investment Program for a grant in the amount of $13,895,277 for the Burgard Bridge Resiliency and Multimodal Enhancement Project on September of 2022; and In May of 2023, the Federal Highway Administration (FHWA) notified the City of Portland of the award of the grant for the Burgard Bridge Resiliency and Multimodal Enhancement Project to the Portland Bureau of Transportation in the amount of $13,895,277; On March 13th, 2024, the Council approved Ordinance #191654 approving an Intergovernmental Agreement with the Oregon Department of Transportation for the Burgard Bridge Resiliency and Multimodal Enhancement Project. The Portland Bureau of Transportation matched the grant with an additional $3,473,819 from the Heavy Vehicle Use Tax (HVUT). Procurement Services and the Portland Bureau of Transportation recommend that the alternative contracting method of Construction Manager/General Contractor (CM/GC) be used in lieu of the low bid competitive bidding process. The successful contractor will provide input during the design process for value engineering and constructability review, will assist in developing phasing and other construction planning, and will provide the highly specialized skills required to shorten the overall duration of Project construction. The City will invite prospective contractors to submit competitive proposals in response to a Request for Proposal (RFP). A selection committee will select the contractor based on an evaluation of the proposals. The RFP process will be completed under the guidance and direction of Procurement Services and in accordance with Portland Public Contracting Rules set forth in 5.34. The Council is the Local Contract Review Board for the City with the authority to exempt certain public contracts from the competitive bidding requirements of ORS Chapter 279C and Portland Public Contracting Rules set forth in 5.34 Draft findings addressing favoritism, competition, substantial costs savings, operational, budget, financial data, public benefits, value engineering, specialized expertise, public safety, market conditions, technical complexity and funding sources recommended by the City, substantially in the form attached hereto as Exhibit A, were made available and a notice of the public hearing of this Ordinance was published fourteen (14) days in advance of this public hearing. The Portland Bureau of Transportation has funds budgeted in FY 2024/2025 for design and proposed funds in FY 2025/2026 for design, construction, inspection, and management of the project. The estimated total for the CM/GC contract is $9,000,000 to $11,000,000 (low confidence); the project is in the preliminary design stage.NOW, THEREFORE, the Council directs:That the Findings, as attached as Exhibit A, are hereby approved and, on that basis, the Burgard Bridge Resiliency and Multimodal Enhancement Project is exempt from the competitive bidding requirements of ORS Chapter 279C.The Chief Procurement Officer is authorized to use a competitive Request for Proposal process to select a CM/GC contractor for the Project in accordance with ORS Chapter 279C, Portland Public Contracting Rules 5.34.800-890, and OAR 137-049-0690.The Auditor to draw and deliver warrants chargeable to T01183 when demand is presented and approved by the proper authority.As required by ORS 279C.335 and Portland Public Contracting Rules 5.34.820, PBOT will prepare and deliver a post project evaluation to the Council on behalf of the Chief Procurement Office once the City accepts the Project as complete.Section 2. The Council declares that an emergency exists because preliminary engineering activities have begun and the CM/GC's participation in value engineering, constructability reviews and construction planning should occur as soon as possible in order to positively impact design and construction issues and meet the mandated timeline for Project completion by December 2029; therefore, this Ordinance shall be in full force and effect from and after its passage by the Council.

Meeting history2 meetings · 2 votes
Referred to City CouncilAgenda item 3

Motion to send Ordinance, Document Number 2025-285, to the full Council with recommendation the ordinance be passed: Moved by Green and seconded by Morillo. (Aye (4): Koyama Lane, Morillo, Green, Clark); Absent (1): Smith)

Read all 1 exact motions
Jul 21, 2025 · Main · Passed

Motion to send Ordinance, Document Number 2025-285, to the full Council with recommendation the ordinance be passed: Moved by Green and seconded by Morillo. (Aye (4): Koyama Lane, Morillo, Green, Clark); Absent (1): Smith)

Latest recorded vote shown above
Meeting-level motion or recommendation · Jul 21, 20254 yes · 1 absent

Motion to send Ordinance, Document Number 2025-285, to the full Council with recommendation the ordinance be passed: Moved by Green and seconded by Morillo. (Aye (4): Koyama Lane, Morillo, Green, Clark); Absent (1): Smith)

About this recordSource checks & change history

0 human-reviewed findings are linked to this record. Unreviewed machine-extracted fragments are not presented as findings.

Technical information-completeness check · Ready With Caveats · Rules v2

This checks whether decision-relevant categories appear in the published packet. It does not recommend approval or opposition.

Decision definition

The official title and operative text identify the requested action.

Complete
Official legal text

Official text was found. This check does not certify that every referenced exhibit is complete.

Complete
Financial impact

The official impact statement includes financial information.

Complete
Funding source

The impact statement identifies funding information without an explicit unresolved-source qualifier.

Complete
Supporting documents

No linked attachments were found on the official page.

Unknown
Referenced exhibit integrity

The text references exhibits. This guide has not yet automatically verified that each referenced exhibit is present, populated, and internally consistent.

Unknown
Counterparty acceptance

The reviewed action is not expressly identified as a non-binding agreement.

Not Applicable
Implementation

A direction, reporting requirement, or deadline appears in the official text.

Complete
Document stability

Stability requires at least two observed snapshots; the system will update this after another ingestion.

Unknown
Source record
First discovered
Aug 13, 2026, 1:12 PM PDT
Last checked
Nov 14, 2026, 1:26 AM PST
Evidence hash
14276676ade8112f
Guide status
Deterministic baseline
Append-only timeline
  1. SOURCE UPDATED

    Passed

  2. DOCUMENT PUBLISHED

    Observed in the official source.

  3. Council Action

    Passed

  4. Council Action

    Referred to City Council