Decisions/2026-312
Ordinance2026-312

What is Portland deciding about add Bulk Fuel Terminal Capacity Reduction Regulations Code to reduce Critical Energy Infrastructure Hub fuel storage by 2036 in support…

The purpose of the proposed regulations is to support risk reduction and management in the CEI Hub by requiring bulk fuel terminals to reduce their storage capacity by at least 20 percent by December 1, 2036. The CEI Hub is a six-mile stretch of land in northwest Portland located along the Willamette River. It contains facilities that store and distribute fuels as part of a supply chain critical to Oregon's fuel infrastructure, with more than 90 percent of the state's liquid fuel supply stored at and passing through the CEI Hub via pipeline, barge, or rail. Numerous studies have found that the concentration of bulk fuel terminals in the CEI Hub presents significant risks, primarily due to the CEI Hub's location on land with a high risk of liquefaction. In the event of a major earthquake, particularly a Cascadia Subduction Zone (CSZ) event, storage tanks in the CEI Hub are likely to fail, releasing fuel and other hazardous materials. Such a disaster would pose serious threats to human health and to the environment, including waterways, air quality, and adjacent natural areas. The fuel storage reduction percentage specified in these regulations is based on the City's understanding of existing storage capacity across the 11 terminals in the CEI Hub and how fuel demand is projected to change over time.

Official impact statement
See the official legal title

Add Bulk Fuel Terminal Capacity Reduction Regulations Code to reduce Critical Energy Infrastructure Hub fuel storage by 2036 in support of hazard mitigation (add Code Chapter 17.112)

Next appearanceNo future appearance is published yet.
Follow this matter
01 · Understand it

What this proposal would actually do.

Plain-language orientation first. Every substantive statement below links to its official basis.

What would change

The purpose of the proposed regulations is to support risk reduction and management in the CEI Hub by requiring bulk fuel terminals to reduce their storage capacity by at least 20 percent by December 1, 2036. The CEI Hub is a six-mile stretch of land in northwest Portland located along the Willamette River. It contains facilities that store and distribute fuels as part of a supply chain critical to Oregon's fuel infrastructure, with more than 90 percent of the state's liquid fuel supply stored at and passing through the CEI Hub via pipeline, barge, or rail. Numerous studies have found that the concentration of bulk fuel terminals in the CEI Hub presents significant risks, primarily due to the CEI Hub's location on land with a high risk of liquefaction. In the event of a major earthquake, particularly a Cascadia Subduction Zone (CSZ) event, storage tanks in the CEI Hub are likely to fail, releasing fuel and other hazardous materials. Such a disaster would pose serious threats to human health and to the environment, including waterways, air quality, and adjacent natural areas. The fuel storage reduction percentage specified in these regulations is based on the City's understanding of existing storage capacity across the 11 terminals in the CEI Hub and how fuel demand is projected to change over time.

Official proposal and impact statement
What would stay the same

The reviewed sources do not clearly identify every existing policy, service, contract, or obligation that would remain unchanged.

Official matter record
Who may be affected

Community Impacts: The regulations will impact communities located near the CEI Hub and will impact bulk fuel terminals in the CEI Hub. The benefits accrue to both the communities located near and the terminals located in the CEI Hub by reducing the risks associated with a major disaster in the area. The fuel storage reduction percentage specified in these regulations is based on the City's understanding of existing storage capacity across the 11 terminals in the CEI Hub and how fuel demand is projected to change over time. The City engaged Parametrix Consulting to project fuel demand overtime. The modelling found that fuel demand will remain relatively stable in the near-term before declining in the long term. The capacity reduction timeline included in the regulations has been calibrated so that projected fuel demand can continue to be accommodated even under the proposed reduction. In this way, an potential negative impacts of a reduction in fuel storage capacity have been mitigated.Community Involvement: The draft BFT Capacity Reduction Regulations were published in early June 2026, and staff engaged the community as follows:Two online information sessions for the public to learn more and ask questions. One will be scheduled during the workday and the other in the evening.An online Map App with project information, portal to provide written comments, and opportunity to view the written comments of others. A project website provided an overview of the draft BFT Capacity Reduction Regulations and links to extensive background information.A focused informational meeting with community and environmental organizations that had been engaged in the CEI Hub Policy Project community outreach events.Presentations to groups as invited and available.A project email to a list of community and other interested parties. The email provided an additional opportunity to ask questions of staff or provide written comments.Staff expect that City Council will hear testimony from community and neighborhood organizations, industry and industry-related business organizations, individuals who live in proximity to the CEI Hub, environmental organizations, and others.

Official community impact statement
What happens next

Referred to Finance and Governance Committee of the Whole by Council President

Official matter record
02 · Evaluate it

What the record establishes and what it does not.

Votes show choices. They do not, by themselves, prove why a member made that choice.

No named decision vote is linked yet.

A missing vote is not treated as approval, opposition, or evidence of a Councilor’s position.

Rationale review not yet published

We will not turn the roll call into invented arguments.

The vote above establishes who supported or opposed that exact motion. A source-validated account of the competing reasons will appear only after human review of the meeting transcript and documents.

Financial implications

This project does not amend the budget, change staffing levels, reclassify staff, or authorize new spending or other financial obligations (IGAs, contracts, etc.) and therefore there are no financial or budgetary impacts to the City. The amendments will result in additional workload for BPS staff to process and verify the inventories of bulk fuel terminal storage capacity. Staff estimates that processing and verifying each inventory will cost $10,000. The amendments include establishment of a fee to cover the estimated costs associated with the increased staff work.

Official financial impact statement
Open questions
  • The source-linked record has not yet received a human review of competing arguments. A yes or no vote alone does not establish a Councilor’s rationale.
  • What amendments, conditions, or new evidence could change the proposal before final action?
Can residents still participate?

Check the official Council agenda for current testimony instructions and deadlines; this guide is not official testimony.

Official Council agenda
03 · Verify it

Inspect the complete research record.

Official text, source files, exact motions, roll calls, provenance, and the technical completeness check remain available without crowding the explanation above.

Official documents5 sources
Current proposal · not final actionOrdinance 2026-312

The proposed legal text currently moving through Council.

Open at Portland.gov
Read the full official text

The City of Portland ordains.Section 1. The Council finds:The City has authority to adopt regulations to protect and promote public health.The State of Oregon and the greater Pacific Northwest are vulnerable to powerful subduction zone earthquakes that occur periodically along the Juan de Fuqua and North American plates.In the past, both the Huu-ay-aht First Nation peoples and the Makah tribe shared stories of lost land and peoples as a result of these earthquakes and tsunamis, which scientific research has matched with Japanese tsunami records and on-the-ground geologic field research to reconstruct the Cascadia earthquake of 1700. This research shows that subduction zone earthquakes have occurred along the Pacific Northwest with relative regularity over the last 10,000 years, and if averages from past events are predictive, the region could be overdue for another powerful subduction zone earthquake.Fuels stored in areas subject to natural hazards, such as liquefaction, wildfire and landslides, pose risks to safety, public health, and livability, including mobility of people, freight, and other commercial vehicles.The Critical Energy Infrastructure (CEI) Hub in northwest Portland consists of eleven (11) bulk fuel terminals and the area is subject to multiple natural hazards, including liquefiable soils, wildfire and landslides.The CEI Hub, which consists of Oregon's primary liquid fuel storage and distribution facilities, receives 90 percent of the state's liquid fuel supply either via pipeline or marine vessel. Most of the fuel storage tanks within the CEI Hub were built before seismic design requirements in Oregon's building codes were adopted in 1993.The facilities that comprise the CEI Hub are vulnerable to failure in the event of subduction zone earthquake. A 2012 Oregon Department of Geology and Mineral Industries (DOGAMI) Earthquake Risk Study for Oregon's Critical Energy Infrastructure Hub report states that a magnitude 8 or 9 Cascadia Subduction Zone earthquake would impact the CEI Hub with: ground shaking; liquefaction; lateral spreading; landslides; and bearing capacity failures. The study also notes that, at the time, only three existing storage tanks were known to have addressed liquefaction vulnerabilities.The Portland Bureau of Emergency Management's Mitigation Action Plan (2021) identifies how natural hazard events like floods, landslides, and earthquakes might affect the City of Portland. The Portland area has experienced numerous earthquakes in the past, ranging from Magnitude 4.5 to 9.0. Portland is expected to experience seismic events in the future.Most of Portland's industrial districts, especially those areas with river access, are located in areas with a high probability of soil liquefaction, as documented by the 2018 DOGAMI Earthquake Regional Impact Analysis, during an earthquake. Fuel storage and associated transloading infrastructure pose considerable risks in the event of a major earthquake as documented by the Portland Bureau of Emergency Management's 2016 Critical Energy Infrastructure Hub Study; the 2012 DOGAMI Earthquake Risk Study for Oregon's Critical Energy Infrastructure Hub report; the 2019 Portland State University Critical Energy Infrastructure Hub Fuel Tank Seismic Assessment, and the 2022 Multnomah County/City of Portland Impacts of a Cascadia Subduction Zone Earthquake on the CEI Hub.The Portland Bureau of Emergency Management's 2021 Mitigation Action Plan identifies how natural hazard events like floods, landslides, and earthquakes might affect the City of Portland. The Portland area has experienced numerous earthquakes in the past, ranging from Magnitude 4.5 to 9.0. The plan defines mitigation as "actions to reduce potential hazard effects or risk."Tribal communities in Oregon have expressed the importance of protecting the river, a life sustaining and sacred water. They have shared their support for efforts to reduce risks associated with the storage of fuel in natural hazard areas near the river and the related threats to human health, cultural heritage, and environmental quality.Regulating and reducing the quantity of fuel storage capacity in a natural hazard area will mitigate the risk to the surrounding community, industrial district, the Willamette River, and Portland as a whole.The Bulk Fuel Terminals (BFT) Capacity Reduction Regulations mitigate risk by advancing the City's understanding of fuel storage conditions and reducing fuel storage capacity in the CEI Hub. The regulations balance risk reduction from fuel storage in a natural hazard area with the need to allow for the continued supply of Oregon's fuel. These regulations in conjunctions with other city and state regulatory requirements can help reduce risk from the terminals and support increased safety and resilience for the community and environment.The BFT Capacity Reduction Regulations feature:Inventory requirements to establish existing storage capacity, and understand material storage conditions and trends in usage and needs;Storage tank capacity reductions by December 1, 2036;Inventory verification processes, including public notification and opportunity for comment;Process and fines for violations;Establishment of a CEI Hub Mitigation Improvement Sub-Fund for receipt of any violation penalties for use toward impact mitigation investments; andEstablishment of administrative fees to cover staff costs of implementation. Administrative fees are required for the processing and verification of the required inventories and for a possible appeal of an inventory's verification. The fees are based on an estimate of the number of staff hours required to complete the work and the billing rates of the staff assigned to complete the work.On June 3, 2026, a draft version of the Title 17 BFT Capacity Reduction Regulations report was released for public review and public comments were accepted through June 30, 2026. BPS received over fifty (50) written public comments submitted through the Map App.On August 17, 2026, the Bulk Fuel Terminal Capacity Reduction Regulations, Amendments to City Code Title 17, dated August 2026, was released for public review.On September 16, 2026, the Finance and Governance Committee of the Whole held a hearing on the Bulk Fuel Terminal Capacity Reduction Regulations, Amendments to City Code Title 17, dated August 2026, and invited public testimony.The City Council held a hearing on the Bulk Fuel Terminal Capacity Reduction Regulations, Amendments to City Code Title 17, dated August 2026, on October 21, 2026, and invited public testimony.The City Council finds that large bulk fuel terminals at the CEI Hub represent a risk to people, property and the natural environment that the City Council finds as a compelling reason to limit future risk by requiring documentation of fuel storage tank status, materials stored, and fill levels to have as complete a picture as possible of BFT operations and reducing the future fuel storage tank capacity at existing terminals. Reducing fuel storage capacity at BFTs in a moderate- to high-risk area will mitigate the risk to the community, environment and economy.Bulk Fuel Terminal Capacity Reduction Regulations, Amendments to City Code Title 17, dated August 2026, are not intended to implement the Comprehensive Plan, apply regardless of whether there is a pending land use application, and are consistent with the City's interest and authority in protecting public health and safety.NOW, THEREFORE, the Council directs:Add City Code Chapter 17.112 as shown in Exhibit A.The City Administrator is authorized to implement procedures and administrative rules as necessary to implement these regulations.The Bureau of Planning and Sustainability will provide a report to City Council in 2028, 2031, and 2036 on the status of Oregon DEQ Risk Mitigation Implementation Plans (RMIPs), updated fuel demand projections and the capacity reduction program.Section 2. If any section, subsection, sentence, clause, phrase, diagram, designation, or drawing contained in this Ordinance, or the plan, map or code it adopts or amends, is held to be deficient, invalid or unconstitutional, that shall not affect the validity of the remaining portions. The Council declares that it would have adopted the plan, map, or code and each section, subsection, sentence, clause, phrase, diagram, designation, and drawing thereof, regardless of the fact that any one or more sections, subsections, sentences, clauses, phrases, diagrams, designations, or drawings contained in this Ordinance, may be found to be deficient, invalid or unconstitutional.

Meetings, motions, amendments, and votes0 meetings · 0 votes
Data quality, timeline, and provenanceRules v2
Why technical findings are hidden above

Unreviewed keyword matches and machine-extracted fragments are not presented as authoritative findings. Only 0 human-reviewed findings are available for this matter.

Technical information-completeness check · Ready With Caveats

This checks whether decision-relevant categories appear in the published packet. It does not recommend approval or opposition.

Decision definition

The official title and operative text identify the requested action.

Complete
Official legal text

Official text was found. This check does not certify that every referenced exhibit is complete.

Complete
Financial impact

The official impact statement includes financial information.

Complete
Funding source

The impact statement identifies funding information without an explicit unresolved-source qualifier.

Complete
Supporting documents

4 linked supporting documents found; presence alone does not verify their internal completeness.

Complete
Referenced exhibit integrity

The text references exhibits. This guide has not yet automatically verified that each referenced exhibit is present, populated, and internally consistent.

Unknown
Counterparty acceptance

The reviewed action is not expressly identified as a non-binding agreement.

Not Applicable
Implementation

A direction, reporting requirement, or deadline appears in the official text.

Complete
Document stability

Stability requires at least two observed snapshots; the system will update this after another ingestion.

Unknown
Source record
First discovered
Aug 31, 2026, 10:39 PM PDT
Last checked
Aug 31, 2026, 10:39 PM PDT
Evidence hash
034c02c802bc9f04
Guide status
Deterministic baseline
Append-only timeline
  1. DOCUMENT PUBLISHED

    Referred to Finance and Governance Committee of the Whole by Council President