Decisions/2025-095
Resolution2025-095

Should Portland direct Bureau of Transportation to construct and maintain sidewalks while addressing pavement maintenance deficiencies throughout Portland, improving…

Overall, the Sidewalk Improvement and Paving Program (SIPP) is a policy package designed as a system-wide approach to rectifying the lack of sidewalks and paved streets in underserved neighborhoods in Portland, particularly areas of Districts 1 and 4. The City has deferred maintenance on our streets and sidewalks for many years – and far too long. PBOT estimates that almost two-thirds of the City’s local streets are in “poor” or “very poor” condition with well over half of busy streets in similarly decrepit conditions. While Portland’s central core benefits from walkable neighborhoods with good sidewalks, most streets in Districts 1 and 4 lack sidewalks entirely. SIPP’s adoption will rely on a few legislative components: An initial resolution describing the SIPP package intended to gain Committee, Council, and public support; A funding and budget ordinance describing the recommended sidewalk, pothole, and other paving and street improvement projects; and An ordinance creating a jobs pipeline connecting existing internship, apprenticeship, and other training and education programs to good jobs that SIPP will create. The sponsors may also seek funding from PCEF for green technologies and sustainable materials that will provide renewable energy (such as solar sidewalks or electric roadways) or reduce the City’s carbon footprint. Each piece of legislation will be structured with a DEI lens to ensure the neighborhoods and communities most in need of safer streets will receive them. The sponsors also contemplate proactive efforts in line with the City’s values and philosophies such as studies or assessments of why particular neighborhoods in Portland suffer more from a lack of sidewalks or have been repeatedly ignored through rounds of deferred maintenance. PBOT’s initial assessment of SIPP projected several benefits: Improved Safety: New sidewalks and pavement maintenance will create safer pedestrian facilities and improve roadway conditions for motorists and cyclists. Enhanced Accessibility: Residents will gain better access to schools, businesses, and public spaces, particularly in underserved neighborhoods. Community Development: Investment in infrastructure will promote economic growth by improving walkability, enhancing curb appeal and attracting local businesses. Environmental Benefits: Adding greenery, such as trees along sidewalks and in the curb zone, will enhance air quality, increase the tree canopy citywide and support temperature reduction/create cooling corridors in key locations throughout Districts 1 and 4. Job Creation: The project will generate construction and other skilled labor opportunities and apprenticeships for residents and youth entering the workforce. Increased Independence: Improved infrastructure will empower individuals with disabilities to navigate their communities with greater ease. Safety Improvements: Well-maintained sidewalks and roads will reduce risks of falls and accidents, particularly for those with mobility challenges. Improved sidewalk and roadway conditions will also contribute to enhanced safety for children traveling to school and for persons using transit. The Sidewalk Improvement and Paving Program represents a significant move towards equitable urban development in Portland, demonstrating a commitment to providing safe, functional infrastructure for all neighborhoods. Based on current assessments, SIPP is expected to take about 4 years.

Official impact statement
See the official legal title

Direct Bureau of Transportation to construct and maintain sidewalks while addressing pavement maintenance deficiencies throughout Portland, improving safety and accessibility for all residents through the Sidewalk Improvement and Paving Program

This is one chapter of a larger storyTransportation funding

How should Portland pay for basic street and sidewalk maintenance after years of deferred work?

Start with the full topic dossier
Next appearanceFinal action is posted; watch for implementation updates.
Follow this matter
01 · Understand it

What this proposal would actually do.

Plain-language orientation first. Every substantive statement below links to its official basis.

What would change

Overall, the Sidewalk Improvement and Paving Program (SIPP) is a policy package designed as a system-wide approach to rectifying the lack of sidewalks and paved streets in underserved neighborhoods in Portland, particularly areas of Districts 1 and 4. The City has deferred maintenance on our streets and sidewalks for many years – and far too long. PBOT estimates that almost two-thirds of the City’s local streets are in “poor” or “very poor” condition with well over half of busy streets in similarly decrepit conditions. While Portland’s central core benefits from walkable neighborhoods with good sidewalks, most streets in Districts 1 and 4 lack sidewalks entirely. SIPP’s adoption will rely on a few legislative components: An initial resolution describing the SIPP package intended to gain Committee, Council, and public support; A funding and budget ordinance describing the recommended sidewalk, pothole, and other paving and street improvement projects; and An ordinance creating a jobs pipeline connecting existing internship, apprenticeship, and other training and education programs to good jobs that SIPP will create. The sponsors may also seek funding from PCEF for green technologies and sustainable materials that will provide renewable energy (such as solar sidewalks or electric roadways) or reduce the City’s carbon footprint. Each piece of legislation will be structured with a DEI lens to ensure the neighborhoods and communities most in need of safer streets will receive them. The sponsors also contemplate proactive efforts in line with the City’s values and philosophies such as studies or assessments of why particular neighborhoods in Portland suffer more from a lack of sidewalks or have been repeatedly ignored through rounds of deferred maintenance. PBOT’s initial assessment of SIPP projected several benefits: Improved Safety: New sidewalks and pavement maintenance will create safer pedestrian facilities and improve roadway conditions for motorists and cyclists. Enhanced Accessibility: Residents will gain better access to schools, businesses, and public spaces, particularly in underserved neighborhoods. Community Development: Investment in infrastructure will promote economic growth by improving walkability, enhancing curb appeal and attracting local businesses. Environmental Benefits: Adding greenery, such as trees along sidewalks and in the curb zone, will enhance air quality, increase the tree canopy citywide and support temperature reduction/create cooling corridors in key locations throughout Districts 1 and 4. Job Creation: The project will generate construction and other skilled labor opportunities and apprenticeships for residents and youth entering the workforce. Increased Independence: Improved infrastructure will empower individuals with disabilities to navigate their communities with greater ease. Safety Improvements: Well-maintained sidewalks and roads will reduce risks of falls and accidents, particularly for those with mobility challenges. Improved sidewalk and roadway conditions will also contribute to enhanced safety for children traveling to school and for persons using transit. The Sidewalk Improvement and Paving Program represents a significant move towards equitable urban development in Portland, demonstrating a commitment to providing safe, functional infrastructure for all neighborhoods. Based on current assessments, SIPP is expected to take about 4 years.

Official proposal and impact statement
What would stay the same

The reviewed sources do not clearly identify every existing policy, service, contract, or obligation that would remain unchanged.

Official matter record
Who may be affected

SIPP will target neighborhoods and communities most in need of help. Safe streets are essential to safe communities. Walkable neighborhoods need good walking paths, whether in the form of traditional sidewalks or specific alternatives. SIPP will focus first on the needs of the community to identify the particular construction or renovation projects that will provide the greatest benefits to those communities. And the City will need to closely and directly involve those communities in discussions about SIPP to make those projects work well.

Official community impact statement
What happens next

Adopted as amended by council

Latest official agenda appearance
02 · Evaluate it

What the record establishes and what it does not.

Votes show choices. They do not, by themselves, prove why a member made that choice.

Final Council action

Passed · 11–1

Read the exact motion or vote question

Final action on 2025-095: Direct Bureau of Transportation to construct and maintain sidewalks while addressing pavement maintenance deficiencies throughout Portland, improving safety and accessibility for all residents through the Sidewalk Improvement and Paving Program

Rationale review not yet published

We will not turn the roll call into invented arguments.

The vote above establishes who supported or opposed that exact motion. A source-validated account of the competing reasons will appear only after human review of the meeting transcript and documents.

Financial implications

The sponsors are working with colleagues in PBOT and the City Budget Office to determine the particular number and range of sidewalk and paving construction projects that can be accomplished through SIPP and the best options for funding.

Official financial impact statement
Open questions
  • The source-linked record has not yet received a human review of competing arguments. A yes or no vote alone does not establish a Councilor’s rationale.
  • What implementation evidence will show whether the intended result occurred?
Can residents still participate?

Official testimony on this decision has closed. Residents can still contact their district Councilors about implementation and follow-up.

Official Council agenda
03 · Verify it

Inspect the complete research record.

Official text, source files, exact motions, roll calls, provenance, and the technical completeness check remain available without crowding the explanation above.

Official documents1 sources
Final legal actionResolution 37705

The operative official record after Council action.

Open at Portland.gov
Read the full official text

WHEREAS, the City of Portland has critical need for improved infrastructure, particularly in underserved neighborhoods, to enhance safety, accessibility, and community development; and WHEREAS, the City has determined that over half of busy streets in Portland are rated in “poor” or “very” poor condition and almost two-thirds of local streets are also rated “poor” to “very poor”; and WHEREAS, of all streets lacking proper sidewalks or pedestrian access, over half of those streets are located in East Portland and Southwest Portland; and WHEREAS, the Sidewalk Improvement and Paving Program (SIPP) aims to address sidewalk and pavement deficiencies, create safer pedestrian facilities, and improve roadway conditions; and WHEREAS, the lack of active transportation investments presents a barrier for Portlanders to safely choose environmentally friendly modes of transportation, undermining the climate objectives of the city; andWHEREAS, prioritizing investments in Districts 1 and 4 will ensure more equitable access to vital pedestrian pathways, enhanced climate resilience, and increased safer road conditions for all residents; and WHEREAS, the sponsors of this resolution intend to seek funding for SIPP from a variety of sources including issuing bonds and allocating funds allocated to PBOT for sidewalk construction and improvements; federal funding from the Safe Streets for All (SS4A) program; funding from the Oregon Department of Transportation (ODOT); and funding from the Portland Clean Energy Community Benefits Fund (PCEF) as appropriate; and WHEREAS, SIPP will establish a system-wide effort that could serve as a model for similar construction and renovation projects across the City of Portland; and WHEREAS, the anticipated benefits of the SIPP include: Improved safety for pedestrians and motorists; Environmental benefits from increased greenery and tree canopies (such as placing trees along sidewalks and walking paths), enhancing air quality, and reducing temperatures to provide cooling corridors in key locations throughout Districts 1 and 4; Enhanced accessibility for residents, allowing better access to schools, businesses, and public spaces; ADA compliant corner and midblock pedestrian ramps; Economic growth through improved walkability, attracting local businesses; Job creation through construction and skilled labor opportunities for residents and youth by increasing funding for SummerWorks programs and additional apprenticeships; Increased independence for individuals with disabilities; Reduced risks of falls and accidents, contributing to enhanced safety for children and transit users; and Opportunities to demonstrate the use and effectiveness of new and emerging green technologies and sustainable materials in transportation networks such as solar sidewalks and green cement. NOW, THEREFORE, BE IT RESOLVED that the Portland City Council directs the Portland Bureau of Transportation (PBOT) to evaluate a full suite of options available to effectively deliver the program objectives, ensuring flexibility to accommodate varying community characteristics across prioritized geographies and active transportation corridors. BE IT FURTHER RESOLVED that the program objectives shall include: (1) constructing and maintaining sidewalks and alternative pathways while addressing pavement maintenance deficiencies throughout Portland, improving safety and accessibility for all residents; (2) prioritizing construction and maintenance projects in historically underserved areas of Portland or those areas most in need; and (3) that are most likely to provide some or all of the intended benefits of SIPP recited above.BE IT FURTHER RESOLVED that PBOT shall engage in neighborhood-specific community engagement exercises to communicate program objectives clearly community input on localized projects, with a tiered approach based on the potential scale of changes. BE IT FURTHER RESOLVED that PBOT will partner with small businesses, contractors, the National Association of Minority Contractors (NAMAC) and/or the Certification Office for Business Inclusion and Diversity (COBID).BE IT FURTHER RESOLVED that PBOT is directed to develop a comprehensive 4-year project list and propose a project delivery framework, including scope, schedule, and budget for individual projects or clusters of projects, along with the recommended methodology for project delivery (in-house or through consultants). BE IT FURTHER RESOLVED that PBOT staff shall utilize existing plans (e.g., PedPDX, area plans, ‘In-Motion’ plans, etc.), PBOT’s Building Belonging Guide, and the PBOT Equity Matrix to inform project prioritization. BE IT FURTHER RESOLVED that PBOT is directed to create a public-facing program website and dashboard that details individual project objectives, components, schedules for delivery, and points of contact for inquiries and concerns. BE IT FURTHER RESOLVED that this initiative exemplifies the City of Portland's commitment to fostering urban equity, enhancing community safety, and building infrastructure that supports all residents in navigating their environment with dignity and ease. BE IT FURTHER RESOLVED that a follow-up resolution is required to evaluate fiscal options for financing SIPP in consultation with the City Budget Office, and will be considered through the Finance Committee. The Climate, Resilience and Land Use Committee will review funding options related to the Portland Clean Energy Community Benefits Fund (PCEF).

Meetings, motions, amendments, and votes4 meetings · 8 votes

Recorded amendments

May 7, 2025 · Recorded

Motion to table discussion of Avalos Amendment 1: Moved by Koyama Lane and seconded by Smith. (Aye (10): Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Dunphy, Smith, Pirtle-Guiney; Nay (2): Kanal, Avalos)

May 7, 2025 · Recorded

Motion to call the question on Avalos Amendment 2: Moved by Clark and seconded by Smith. (Aye (9) Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Smith, Pirtle-Guiney; Nay (3) Kanal, Avalos, Dunphy)

May 7, 2025 · Recorded

Motion to call the question on Avalos Amendment 1: Moved by Zimmerman and seconded by Clark. (Aye (8) Ryan, Koyama Lane, Morillo, Clark, Green, Zimmerman, Smith, Pirtle-Guiney; Nay (4) Kanal, Novick, Avalos, Dunphy)

May 7, 2025 · Failed

Motion to call the question on the Resolution as amended: Moved by Morillo and seconded by Clark. (Aye (6) Ryan, Koyama Lane, Morillo, Clark, Smith, Pirtle-Guiney; Nay (6) Kanal, Novick, Green, Zimmerman, Avalos, Dunphy). Motion failed to pass.

Mar 24, 2025 · Recorded

Motion to adopt the amendments to the Resolved statements for the Resolution, Document Number 2025-095: Moved by Smith and seconded by Green. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Mar 24, 2025 · Recorded

Motion to adopt the amendments to the Whereas statement, Resolved statement to include Councilor Morillo’s proposed edit, and the impact statement for the Resolution, Document Number 2025-095: Moved by Green and seconded by Smith. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Mar 24, 2025 · Passed

Motion to send Resolution as amended, Document Number 2025-095 to the full Council with recommendation the resolution be adopted: Moved by Green and seconded by Koyama Lane. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Read all 11 exact motions
May 7, 2025 · Main · Recorded

Motion to add "and alternative pathways" to the second Resolved Statement: Moved by Clark and seconded by Green. (Aye (12): Kanal, Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Avalos, Dunphy, Smith, Pirtle-Guiney)

May 7, 2025 · Main · Recorded

Motion to add "PBOT's Building Belonging Guide," to the sixth Resolved Statement: Moved by Avalos and seconded by Dunphy. (Aye (9): Kanal, Koyama Lane, Morillo, Novick, Clark, Green, Avalos, Dunphy, Pirtle-Guiney; Nay (3): Ryan, Zimmerman, Smith)

May 7, 2025 · Amendment · Recorded

Motion to table discussion of Avalos Amendment 1: Moved by Koyama Lane and seconded by Smith. (Aye (10): Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Dunphy, Smith, Pirtle-Guiney; Nay (2): Kanal, Avalos)

May 7, 2025 · Main · Failed

Motion to remove references to Districts 1 and 4 in the sixth and ninth Whereas Statements: Moved by Avalos and seconded by Kanal. (Aye (2): Kanal, Avalos; Nay (10): Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Dunphy, Smith, Pirtle-Guiney). Motion failed to pass.

May 7, 2025 · Amendment · Recorded

Motion to call the question on Avalos Amendment 2: Moved by Clark and seconded by Smith. (Aye (9) Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Smith, Pirtle-Guiney; Nay (3) Kanal, Avalos, Dunphy)

May 7, 2025 · Amendment · Recorded

Motion to call the question on Avalos Amendment 1: Moved by Zimmerman and seconded by Clark. (Aye (8) Ryan, Koyama Lane, Morillo, Clark, Green, Zimmerman, Smith, Pirtle-Guiney; Nay (4) Kanal, Novick, Avalos, Dunphy)

May 7, 2025 · Main · Failed

Motion to call the question on the Resolution as amended: Moved by Morillo and seconded by Clark. (Aye (6) Ryan, Koyama Lane, Morillo, Clark, Smith, Pirtle-Guiney; Nay (6) Kanal, Novick, Green, Zimmerman, Avalos, Dunphy). Motion failed to pass.

May 7, 2025 · Main · Recorded

Motion to limit debate to the current queue: Moved by Kanal and seconded by Ryan. (Aye (9): Kanal, Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Dunphy, Smith, Pirtle-Guiney; Nay (3): Novick, Zimmerman, Avalos)

Mar 24, 2025 · Amendment · Recorded

Motion to adopt the amendments to the Resolved statements for the Resolution, Document Number 2025-095: Moved by Smith and seconded by Green. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Mar 24, 2025 · Amendment · Recorded

Motion to adopt the amendments to the Whereas statement, Resolved statement to include Councilor Morillo’s proposed edit, and the impact statement for the Resolution, Document Number 2025-095: Moved by Green and seconded by Smith. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Mar 24, 2025 · Main · Passed

Motion to send Resolution as amended, Document Number 2025-095 to the full Council with recommendation the resolution be adopted: Moved by Green and seconded by Koyama Lane. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Meeting-level motion or recommendation · May 7, 202512 yes

Motion to add "and alternative pathways" to the second Resolved Statement: Moved by Clark and seconded by Green. (Aye (12): Kanal, Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Avalos, Dunphy, Smith, Pirtle-Guiney)

Meeting-level motion or recommendation · May 7, 20259 yes · 3 no

Motion to add "PBOT's Building Belonging Guide," to the sixth Resolved Statement: Moved by Avalos and seconded by Dunphy. (Aye (9): Kanal, Koyama Lane, Morillo, Novick, Clark, Green, Avalos, Dunphy, Pirtle-Guiney; Nay (3): Ryan, Zimmerman, Smith)

Meeting-level motion or recommendation · May 7, 202510 yes · 2 no

Motion to table discussion of Avalos Amendment 1: Moved by Koyama Lane and seconded by Smith. (Aye (10): Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Dunphy, Smith, Pirtle-Guiney; Nay (2): Kanal, Avalos)

Meeting-level motion or recommendation · May 7, 20252 yes · 10 no

Motion to remove references to Districts 1 and 4 in the sixth and ninth Whereas Statements: Moved by Avalos and seconded by Kanal. (Aye (2): Kanal, Avalos; Nay (10): Ryan, Koyama Lane, Morillo, Novick, Clark, Green, Zimmerman, Dunphy, Smith, Pirtle-Guiney). Motion failed to pass.

Final Council action · May 7, 202511 yes · 1 no

Final action on 2025-095: Direct Bureau of Transportation to construct and maintain sidewalks while addressing pavement maintenance deficiencies throughout Portland, improving safety and accessibility for all residents through the Sidewalk Improvement and Paving Program

Meeting-level motion or recommendation · Mar 24, 20255 yes

Motion to adopt the amendments to the Resolved statements for the Resolution, Document Number 2025-095: Moved by Smith and seconded by Green. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Meeting-level motion or recommendation · Mar 24, 20255 yes

Motion to adopt the amendments to the Whereas statement, Resolved statement to include Councilor Morillo’s proposed edit, and the impact statement for the Resolution, Document Number 2025-095: Moved by Green and seconded by Smith. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Meeting-level motion or recommendation · Mar 24, 20255 yes

Motion to send Resolution as amended, Document Number 2025-095 to the full Council with recommendation the resolution be adopted: Moved by Green and seconded by Koyama Lane. (Aye (5): Smith, Koyama Lane, Green, Morillo, Clark)

Data quality, timeline, and provenanceRules v2
Why technical findings are hidden above

Unreviewed keyword matches and machine-extracted fragments are not presented as authoritative findings. Only 0 human-reviewed findings are available for this matter.

Technical information-completeness check · Ready With Caveats

This checks whether decision-relevant categories appear in the published packet. It does not recommend approval or opposition.

Decision definition

The official title and operative text identify the requested action.

Complete
Official legal text

Official text was found. This check does not certify that every referenced exhibit is complete.

Complete
Financial impact

The official impact statement includes financial information.

Complete
Funding source

The impact statement identifies funding information without an explicit unresolved-source qualifier.

Complete
Supporting documents

No linked attachments were found on the official page.

Unknown
Referenced exhibit integrity

No explicit exhibit reference was detected in the official text.

Not Applicable
Counterparty acceptance

The reviewed action is not expressly identified as a non-binding agreement.

Not Applicable
Implementation

A direction, reporting requirement, or deadline appears in the official text.

Complete
Document stability

Stability requires at least two observed snapshots; the system will update this after another ingestion.

Unknown
Source record
First discovered
Aug 13, 2026, 1:15 PM PDT
Last checked
Sep 14, 2026, 2:23 AM PDT
Evidence hash
9706f315d2a4360b
Guide status
Deterministic baseline
Append-only timeline
  1. SOURCE UPDATED

    Adopted as amended by council

  2. DOCUMENT PUBLISHED

    Observed in the official source.

  3. Council Action

    Adopted as amended

  4. Council Action

    Continued

  5. Council Action

    Rescheduled

  6. Council Action

    Referred to City Council as amended