Accept the Future of Large-Scale Performing Arts recommendations to advance a new Broadway-capable venue as part of the proposed Performing Arts + Culture Center at Portland State University, and initiate planning for the future of the Keller Auditorium
Accept the Future of Large-Scale Performing Arts recommendations to advance a new Broadway-capable venue as part of the proposed Performing Arts + Culture Center at Portland State University, and initiate planning for the future of the Keller Auditorium
Referred to City Council as amended on August 11, 2026 by City Life Committee
2 Council session appearances; latest Aug 11, 2026.
Decision readiness
This measures whether decision-relevant information is visible. It does not measure whether the proposal deserves approval.
The official title identifies the requested subject or action.
Official text was found in the reviewed record.
The official impact statement includes financial information.
Funding information appears in the impact statement; inspect the source for precision.
13 linked supporting documents found.
Implementation language appears in the official text.
Stability requires at least two observed snapshots; the system will update this after another ingestion.
- WHEREAS, the City of Portland recognizes the need for a comprehensive and collaborative approach to downtown revitalization that celebrates investments in creative placemaking that supports arts and cultural opportunities to restore and enhance our Central City as a vibrant, inclusive, and thriving urban center; andWHEREAS, in 2017, a private design competition was held to conceptualize what might be possible for a grand scale Keller renovation on site; andWHEREAS, the March 2020 Keller Seismic Analysis Summary Report identified that the Keller Auditorium was not built to withstand major earthquakes and requires significant structural enhancements to weather a major seismic event; and the report outlined the structural deficiencies of the Keller Auditorium and potential options for remedy, including Option 1b: limited building renovation that addresses only seismic upgrades;
- In the City of Portland, more than $723.8 million was generated in total output, which supported over 6,440 total jobs and $309.2 million in resident income.In May 2024, Crossroads Consulting completed an economic impact analysis of a potential temporary closure of Keller Auditorium and found that without a viable alternative location for large-scale theatrical productions including touring Broadway productions, closure for renovation for 24 months would result in lost economic output of $100 million, 336 lost jobs, $42.3 million in lost labor income, and $5.1 million in lost local and state revenues.In April 2026, Hunden Partners completed an economic impact analysis comparing a renovated 3000-seat Keller Auditorium and a new 3,200-seat venue at Portland State University.
- Stabilized demand projections for both scenarios estimate total spending in today's dollars including indirect and induced spending, is estimated at $95.5 million for a new venue at Portland State University, compared to $82.5 million for a renovated Keller, an increase of 16 percent at the Portland State University site.This resolution directs City staff to work with external partners to advance a new Broadway-capable venue at Portland State University while simultaneously planning for the future of the Keller Auditorium as a renovated 1,200 to 1,800-seat venue.
- A new Broadway-capable venue is projected to increase visitation and would significantly impact the arts economy and culture of Portland.In November 2025, 11 technical experts—including from the fields of architecture, construction, finance, fundraising, performing arts, real estate development, urban planning, and venue operations—were appointed by the Deputy City Administrator to serve on a steering committee to make recommendations about the direction of the Future of Large-Scale Performing Arts project.
- Recognizing that the City and Portland State University may have different green building/green construction requirements for improvement projects (e.g., Leadership in Energy and Environmental Design (LEED)), the project team would adopt the more advanced sustainability program goals unless the parties mutually agree in writing that a lesser standard should be applicable to identified aspects of the project.Any efforts to transform the existing Keller Auditorium will adhere to the City of Portland's Green Building Policy, upholding the most current environmental building standards embedded within City code.
- This could result in more than $800 million in real estate investment in the Central City.
Not found in the reviewed official text.
- WHEREAS, the City of Portland recognizes the need for a comprehensive and collaborative approach to downtown revitalization that celebrates investments in creative placemaking that supports arts and cultural opportunities to restore and enhance our Central City as a vibrant, inclusive, and thriving urban center; andWHEREAS, in 2017, a private design competition was held to conceptualize what might be possible for a grand scale Keller renovation on site; andWHEREAS, the March 2020 Keller Seismic Analysis Summary Report identified that the Keller Auditorium was not built to withstand major earthquakes and requires significant structural enhancements to weather a major seismic event; and the report outlined the structural deficiencies of the Keller Auditorium and potential options for remedy, including Option 1b: limited building renovation that addresses only seismic upgrades;
- This will include conducting community engagement, market study, financial analysis, and initial design work to determine feasibility as a renovated 1,200 to 1,800-seat performing arts venue.
- In October 2023, Americans for the Arts released the findings of its Arts and Economic Prosperity 6 study, which is an economic and social impact study of the nation's non-profit arts and culture industry.
- This resolution directs the Deputy City Administrator to commit staff resources to complete pre-development functions in collaboration with Portland State University.This resolution also directs the Deputy City Administrator to direct staff to begin planning for the future of the Keller Auditorium, including community engagement, market study, financial analysis, and initial design work, the cost of which is to be determined.Existing staff capacity should be sufficient to advance this work over the coming months.This resolution does not itself have immediate and significant direct financial impacts for the City.
Not found in the reviewed official text.
Not found in the reviewed official text.
Documents
Official page textRead
WHEREAS, the City of Portland recognizes the need for a comprehensive and collaborative approach to downtown revitalization that celebrates investments in creative placemaking that supports arts and cultural opportunities to restore and enhance our Central City as a vibrant, inclusive, and thriving urban center; andWHEREAS, in 2017, a private design competition was held to conceptualize what might be possible for a grand scale Keller renovation on site; andWHEREAS, the March 2020 Keller Seismic Analysis Summary Report identified that the Keller Auditorium was not built to withstand major earthquakes and requires significant structural enhancements to weather a major seismic event; and the report outlined the structural deficiencies of the Keller Auditorium and potential options for remedy, including Option 1b: limited building renovation that addresses only seismic upgrades; Option 2: a major renovation including new additions; and Option 3: a new facility on the existing site or an alternative site; andWHEREAS, an association of neighborhood property owners and design professionals, the Halprin Landscape Conservancy, became interested in continuing this work and further refining Option 2 with a large-scale renovation concept to see if it would be feasible; andWHEREAS, in a joint letter dated September 14, 2022, between the City of Portland and Metro, the City and Metro each committed $200,000 in funding toward the Halprin Landscape Conservancy while requiring an additional private match of $200,000 to further develop a large-scale renovation option to determine its feasibility; andWHEREAS, on September 27, 2023, Halprin Landscape Conservancy presented their concept for a renovated Keller Auditorium to Portland City Council; andWHEREAS, in order to better understand the possibilities of replacing the theater with a new state-of-the-art facility on an alternate site as outlined in Option 3 of the Seismic Analysis, the City released a Request for Expression of Interest (RFEI) on July 12, 2023 to explore potential new performing arts facility sites in Portland; andWHEREAS, on August 11, 2023, the City received eight proposals in response to the RFEI and narrowed them down to five on September 25, 2023 for further discussion; andWHEREAS, further discussions were conducted the week of October 23, 2023 with the five proposers and on November 9, 2023, the top two proposals were selected for further study: Urban Renaissance Group at Lloyd Center and Portland State University; andWHEREAS, on January 31, 2024, the two proposers were each awarded $50,000 grants from the City's Spectator Venues Program to develop conceptual designs and test the feasibility of their sites for a new performing arts facility; andWHEREAS, on May 22, 2024, the City received an economic impact study to better understand the impacts of a closure of the Keller Auditorium for a potential future renovation which showed that the combined economic impact of a venue closure, with no alternative location for shows, would be profound; andWHEREAS, on May 28, 2024, an independent cost consultant with extensive experience in performing arts facilities retained by Metro, estimated the costs of the three proposals: Keller renovation, $290 million; Lloyd Center, $429 million and Portland State University, $447 million; andWHEREAS, on May 29, 2024, all three groups presented their renovation and new facility design concepts to City Council and more than 61 community members and interested parties signed up to testify and provide written testimony; andWHEREAS, on May 31, 2024, formal public outreach began, including targeted stakeholder engagement meetings with Metropolitan Exposition and Recreation Commissioners, arts organizations, Portland'5 Centers for the Arts Youth Council, Travel Portland, Portland Metro Chamber, Portland'5 staff, labor (IATSE Local 28), independent venues, and Portland'5 Community Arts and Culture Council, and a monthlong public survey to hear community members' values and priorities for a new or renovated premier performing arts facility; andWHEREAS, on July 8, 2024, the formal public outreach period closed and the City and its consultants began analyzing feedback data to create a community engagement summary report for City Council; andWHEREAS, during the outreach period and at the May 29, 2024 City Council presentation, two key themes emerged: first, that there is a preference among users, arts groups, employees, labor unions, operators, regional tourism interests and Central City business interests to avoid any closure period that impacts the ability to hold large productions at Keller Auditorium; and second, that there is a high level of attachment to the current site, its proximity to the Keller Fountain, and concern about what would happen to the current site if large theatrical productions were moved to a new venue; and WHEREAS, after evaluating the economic impact study and receiving extensive input from users, arts groups, employees, operators, regional tourism interests and Central City business interests, it is evident that the negative impacts of a construction closure could be avoided if an alternative option exists that would not shutdown operations for any extended period of time; andWHEREAS, on August 14, 2024, the City Council was presented with the results from community engagement and the Mayor directed staff to work with the Halprin Landscape Conservancy and Portland State University teams to identify a solution to bring the two teams together to form a recommendation that best meets the needs of Portlanders and avoids a prolonged closure of Portland's premiere large performing arts theater; andWHEREAS, the teams from Halprin Landscape Conservancy and Portland State University met nine times over the course of five weeks in 2024, and invited subject matter experts from Portland'5 Centers for the Arts, the resident nonprofit arts companies and labor to provide input before reaching consensus on a two Broadway-capable venue strategy; andWHEREAS, on October 10, 2024, City Council unanimously adopted Resolution #37680 to accept the recommendation to pursue a strategy to develop two Broadway-capable venues, avoiding a prolonged closure of the Keller Auditorium, while greenlighting the path for a traffic study, market feasibility study to better understand the opportunity for a two-venue strategy and the appropriate seat count for Broadway-capable venues, and subsequent financing strategy; andWHEREAS, on October 31, 2024, City Council adopted Resolution #37684 establishing a performing arts venues workgroup to evaluate management of the Portland'5 Centers for the Arts facilities; andWHEREAS, on June 25, 2025, the performing arts venues workgroup published final recommendations, including the short-term recommendations to address deferred maintenance and necessary building modernizations upgrades and future replacement by completing facility condition assessments; immediately beginning capital planning; and committing to not fund capital maintenance with surplus revenue from venue operations; andWHEREAS, on June 27, 2025, the City received a transportation study from the firm DKS Associates of the potential scenarios, including renovation of the Keller site, the construction of a new venue at Portland State University, and combined uses at both locations, that found no fatal flaws but identified challenges and opportunities with potential considerations for future site refinement and recommended a lane reduction pilot project at the existing Keller site and the incorporation of traffic impact reduction treatments at the Portland State University site as project design advances; andWHEREAS, in June 2025, the Oregon legislature adopted Senate Bill 5505, allocating $85 million in bonds for Portland State University's Performing Arts and Culture Center for the construction of a community theater and academic space, and $52.5 million in bonds for associated on-site parking infrastructure that could support and enhance a future City-owned facility at that site; andWHEREAS, on November 15, 2025, the City signed a Letter of Intent (LOI) with Portland State University for future site development that included development concepts, policy visions, financial evaluation, building programming, desired scope and operations of the building; andWHEREAS, in January 2026, the City received a market feasibility study completed by Hunden Partners, a nationally recognized consultant with expertise in real estate development, tourism development and economic development, from July to December 2025 that found there is insufficient market demand or comparable market support to justify two Broadway-capable venues in Portland, that a new venue should focus on maximizing Broadway content and maintaining theatre-style commercial content while also being an accessible home to resident companies and non-profits, and that the ideal seating capacity of a new venue is 3,200; andWHEREAS, in April 2026, the City received an economic impact study conducted by Hunden Partners from March to April 2025, informed by the findings from the market feasibility study that considered projected stabilized demand, revenue, and economic impact projections for a renovated Keller with an assumed 3,000-seat capacity and a new Portland State University venue with an assumed 3,200-seat capacity and found that a larger new venue at Portland State University is expected to achieve a lift of 8 percent in attendance, 12 percent in operating revenues, and 16 percent in economic impacts compared to a renovated Keller; andWHEREAS, in April 2026, the City received a facility condition assessment for the Keller Auditorium that found the building no longer meets modern performance expectations, many building envelope and theatrical systems show extensive deterioration, and investments estimated at $8.5 million to $17.5 million are needed to maintain current service levels for the next ten years – in addition to the more significant deferred maintenance and seismic needs; andWHEREAS, in November 2025, the Deputy City Administrator for Community & Economic Development appointed an 11-member steering committee with technical expertise in architecture, construction, finance, fundraising, performing arts, public-private partnerships, real estate development, urban planning and venue operations, which met eight times between December 2025 and June 2026 to review relevant reports and studies related to this project; andWHEREAS, on June 24, 2026, the steering committee submitted its unanimous recommendation to build a new Broadway-capable venue at Portland State University as part of the proposed Performing Arts + Culture Center and, simultaneously, create an actionable plan to reimagine the Keller Auditorium and/or site based on Portland's historic, cultural, and civic values; andWHEREAS, in November 2025, Mayor Wilson invited key stakeholders from Portland's performing arts ecosystem, including members of the Portland City Council, the Multnomah County Board of Commissioners, and the Metro Council, to join his ex officio table, which met four times between January and June 2026 to review the details of the City's studies related to this project; andWHEREAS, on June 26, 2026, a majority of the Mayor's ex officio table submitted a recommendation for a phased approach to build a new Broadway-capable venue at Portland State University; maintain Broadway programming at Keller during construction of the new venue to avoid economic losses and continue cultural activity; initiate planning for the Keller's future as a right-sized 1200 to1800-seat venue that addresses unmet market needs; then begin renovation of the Keller Auditorium when the Portland State University venue becomes operational; andWHEREAS, Prosper Portland has a longstanding Disposition and Development Agreement with Portland State University for partnership in the North Macadam Tax Increment Finance District, which includes $7.2 million in funding for redevelopment of the University Place site.NOW, THEREFORE, BE IT RESOLVED that this resolution with the attached Exhibits A-E is accepted by the City Council; andBE IT FURTHER RESOLVED that the City Council support advancing planning and pre-development for a potential new City-owned approximately 3,000-seat Broadway-capable venue as part of the proposed Performing Arts + Culture Center at Portland State University at 310/330 SW Lincoln Street, with a goal of opening in 2030, capitalizing on the state's funding commitment of $137.5 million, public private partnerships, and a future forward vision that expands Portland's arts ecosystem, subjectto future City Council review and approval of the project's financial plan, capital funding strategy, and City financial obligations; andBE IT FURTHER RESOLVED that the Deputy City Administrator is directed to stand up a staff project team of technical experts with Portland State University to complete pre-development functions, including but not limited to: develop a detailed financial plan with a fully defined capital stack, funding timelines, return on invested capital (ROIC) and operations and maintenance responsibilities that provides a clear understanding of the City's obligations and costs for the project; direct a cohesive, comprehensive philanthropic strategy, collaborate with the Portland State University Foundation in its role as lead philanthropic strategist, and work together to identify and secure necessary funding; provide input into the initial phases of the project and project construction management direction; andBE IT FURTHER RESOLVED that adoption of this resolution does not authorize, appropriate, or commit City funds for development or construction of the proposed Portland State University venue beyond funding previously authorized by City Council; andBE IT FURTHER RESOLVED that prior to execution of any agreement that financially obligates the City to development or construction of the proposed Portland State University venue, the Deputy City Administrator shall return to City Council with the detailed financial plan described in this resolution, including a fully defined capital stack, total estimated project cost, proposed City contribution and funding sources, confirmed and anticipated funding from other public and private partners, anticipated ongoing City operating and maintenance obligations, and material financial risks, for City Council review and approval.BE IT FURTHER RESOLVED that the Deputy City Administrator is directed to develop a Project Commitment Agreement with Portland State University by December 1, 2026, that establishes the scope, schedule, and governance framework for the project and a shared commitment between the City and Portland State University to develop a proposed full capital funding strategy, provided that the Project Commitment Agreement shall not obligate the City to provide capital funding or otherwise financially commit the City to development or construction of the project without subsequent City Council approval; andBE IT FURTHER RESOLVED that the Deputy City Administrator is directed to designate a pre-development steering committee to participate in the process as needed; andBE IT FURTHER RESOLVED that while development of a new Broadway-capable venue at Portland State University is ongoing, programming, including Broadway shows, and City investment will continue at the Keller Auditorium to avoid economic losses, upgrade the facility, and continue cultural activity; andBE IT FURTHER RESOLVED BE IT FURTHER RESOLVED that the City will identify and pursue funding sources, where feasible, to support implementation of an adopted plan for the future of Keller Auditorium, including potential funding from City Council, the State Legislature, Metro, the federal government, and other appropriate sources.BE IT FURTHER RESOLVED that the Deputy City Administrator is directed to direct staff to initiate planning for the future of the Keller Auditorium, to be conducted in tandem with the Portland State University 3000-seat venue. This will include conducting community engagement, market study, financial analysis, and initial design work to determine feasibility as a renovated 1,200 to 1,800-seat performing arts venue.
Motions, amendments & votes
Motion to amend the Resolution as shown in Avalos 1: Moved by Avalos and seconded by Morillo. (Aye (5): Morillo, Zimmerman, Avalos, Ryan, Pirtle-Guiney)
Motion to amend the Resolution as shown in Avalos 2: Moved by Avalos and not seconded.
Motion to amend the Resolution as shown in Avalos 2a: Moved by Avalos and seconded by Zimmerman. Request by Pirtle-Guiney to divide Avalos 2a to consider the first and second proposed added Resolved statements separately.
Motion to amend the Resolution to remove “proposed City contribution and funding sources, confirmed and anticipated funding from other public and private partners” from the proposed added second Resolved statement in Avalos 2a: Moved by Avalos and seconded by Pirtle-Guiney. Motion withdrawn. Vote called on the first proposed added Resolved statement as shown in Avalos 2a. (Aye (5): Morillo, Zimmerman, Avalos, Ryan, Pirtle-Guiney) Vote called on the second proposed added Resolved statement as shown in Avalos 2a. (Aye (4): Morillo, Zimmerman, Avalos, Ryan; Nay (1): Pirtle-Guiney)
Motion to amend Resolution as shown in Avalos 3: Moved by Avalos and seconded by Morillo. (Aye (5): Morillo, Zimmerman, Avalos, Ryan, Pirtle-Guiney)
Motion to amend the Resolution as shown in Clark-Zimmerman 1: Moved by Zimmerman and seconded by Pirtle-Guiney. Motion withdrawn.
Motion to amend Resolution as shown in Clark-Zimmerman 2: Moved by Zimmerman and seconded by Pirtle-Guiney. (Aye (4): Zimmerman, Avalos, Ryan, Pirtle-Guiney; Nay (1): Morillo)
Motion to refer the Resolution as amended, Document Number 2026-270, to City Council with the recommendation it be adopted: Moved by Zimmerman and seconded by Pirtle-Guiney. (Aye (4): Morillo, Zimmerman, Avalos, Pirtle-Guiney; Nay (1): Ryan)
Motion to amend the Resolution to remove “proposed City contribution and funding sources, confirmed and anticipated funding from other public and private partners” from the proposed added second Resolved statement in Avalos 2a: Moved by Avalos and seconded by Pirtle-Guiney. Motion withdrawn. Vote called on the first proposed added Resolved statement as shown in Avalos 2a. (Aye (5): Morillo, Zimmerman, Avalos, Ryan, Pirtle-Guiney) Vote called on the second proposed added Resolved statement as sho
Motion to refer the Resolution as amended, Document Number 2026-270, to City Council with the recommendation it be adopted: Moved by Zimmerman and seconded by Pirtle-Guiney. (Aye (4): Morillo, Zimmerman, Avalos, Pirtle-Guiney; Nay (1): Ryan)
Motion to amend Resolution as shown in Avalos 3: Moved by Avalos and seconded by Morillo. (Aye (5): Morillo, Zimmerman, Avalos, Ryan, Pirtle-Guiney)
Motion to amend the Resolution as shown in Avalos 1: Moved by Avalos and seconded by Morillo. (Aye (5): Morillo, Zimmerman, Avalos, Ryan, Pirtle-Guiney)
Motion to amend Resolution as shown in Clark-Zimmerman 2: Moved by Zimmerman and seconded by Pirtle-Guiney. (Aye (4): Zimmerman, Avalos, Ryan, Pirtle-Guiney; Nay (1): Morillo)
Money & effects
Built in 1917, the Keller Auditorium is one of the City-owned Portland'5 Centers for the Arts venues. It is the only large-scale Broadway-capable theater in the region, and it draws 400,000 visitors annually to downtown Portland. Like many older buildings, the Keller Auditorium was not built to withstand a major earthquake, and is in need of major renovation or replacement. To avoid a prolonged closure of Keller Auditorium during a renovation, Portland City Council passed Resolution 37680 in October 2024, accepting the recommendation to pursue a strategy to develop two Broadway-capable venues—a renovated Keller Auditorium and a new facility at Portland State University. Resolution 37680 also directed or authorized studies, committees and strategies to inform a path forward.This resolution contains recommended next steps for the City's Future of Large-Scale Performing Arts venues work. The directives in the resolution are consistent with the recent recommendations of two ad-hoc advisory groups for this project: a steering committee of technical experts convened by the Office of Arts & Culture, and an ex officio table convened by Mayor Wilson. The resolution directs City staff to work with external partners to advance a new Broadway-capable venue with approximately 3,000 seats as part of the proposed Performing Arts + Culture Center at Portland State University, and initiate planning for the future of the Keller Auditorium as a 1,200 to 1,800-seat venue.
In October 2023, Americans for the Arts released the findings of its Arts and Economic Prosperity 6 study, which is an economic and social impact study of the nation's non-profit arts and culture industry. The study found that the industry generated $151.7 billion of economic activity in 2022, which supported 2.6 million jobs and $101 billion in labor income. In the City of Portland, more than $723.8 million was generated in total output, which supported over 6,440 total jobs and $309.2 million in resident income.In May 2024, Crossroads Consulting completed an economic impact analysis of a potential temporary closure of Keller Auditorium and found that without a viable alternative location for large-scale theatrical productions including touring Broadway productions, closure for renovation for 24 months would result in lost economic output of $100 million, 336 lost jobs, $42.3 million in lost labor income, and $5.1 million in lost local and state revenues.In April 2026, Hunden Partners completed an economic impact analysis comparing a renovated 3000-seat Keller Auditorium and a new 3,200-seat venue at Portland State University. Stabilized demand projections for both scenarios estimate total spending in today's dollars including indirect and induced spending, is estimated at $95.5 million for a new venue at Portland State University, compared to $82.5 million for a renovated Keller, an increase of 16 percent at the Portland State University site.This resolution directs City staff to work with external partners to advance a new Broadway-capable venue at Portland State University while simultaneously planning for the future of the Keller Auditorium as a renovated 1,200 to 1,800-seat venue. This strategy capitalizes on the state's funding commitment of $137.5 million, unlocks potential philanthropy and public-private partnerships, and expands Portland's arts ecosystem. This could result in more than $800 million in real estate investment in the Central City.
The Keller Auditorium is the region's only venue capable of hosting large-scale theatrical performances including touring Broadway productions. The programming at the venue draws 400,000 attendees to downtown Portland each year. In 2024, 80 percent of attendees came from within 25 miles, drawing from portions of Multnomah, Washington, Yamhill, Clackamas, Marion, Clark, Columbia, Cowlitz, and Skamania counties. At the same time, the Keller Auditorium attracted visitors traveling from more than 100 miles away, while approximately 40 percent of its attendees were Portland residents. A new Broadway-capable venue is projected to increase visitation and would significantly impact the arts economy and culture of Portland.In November 2025, 11 technical experts—including from the fields of architecture, construction, finance, fundraising, performing arts, real estate development, urban planning, and venue operations—were appointed by the Deputy City Administrator to serve on a steering committee to make recommendations about the direction of the Future of Large-Scale Performing Arts project. The steering committee received reports, studies and progress updates related to the project and provided their perspectives and feedback from December 2025 through June 2026.Also in November 2025, Mayor Keith Wilson invited key stakeholders of Portland's performing arts ecosystem including regional elected officials, arts leaders, labor representatives, and other interested parties to join his ex officio table. These 15 stakeholders met four times from January through June 2026 to review relevant studies and to provide guidance.In June 2026, although convened separately and serving different roles in the planning process, these two advisory bodies recommended a similar phased approach for the future of Portland's large-scale performing arts. The directives in this resolution are consistent with their recent recommendations.Future phases of community involvement will include continued partnership with key stakeholders and opportunities for public comment.
This resolution directs the Deputy City Administrator to commit staff resources to complete pre-development functions in collaboration with Portland State University.This resolution also directs the Deputy City Administrator to direct staff to begin planning for the future of the Keller Auditorium, including community engagement, market study, financial analysis, and initial design work, the cost of which is to be determined.Existing staff capacity should be sufficient to advance this work over the coming months.This resolution does not itself have immediate and significant direct financial impacts for the City. However, it advances a body of work related to facilities planning that will inform potential future conversations and decisions around public capital investment.
A Broadway-capable venue as part of Portland State University's proposed Performing Arts + Culture Center would be designed with the aim of reducing both embodied and operational carbon impacts and the goal of meeting Living Building requirements. Recognizing that the City and Portland State University may have different green building/green construction requirements for improvement projects (e.g., Leadership in Energy and Environmental Design (LEED)), the project team would adopt the more advanced sustainability program goals unless the parties mutually agree in writing that a lesser standard should be applicable to identified aspects of the project.Any efforts to transform the existing Keller Auditorium will adhere to the City of Portland's Green Building Policy, upholding the most current environmental building standards embedded within City code.
Implementation & accountability
The reviewed source does not identify a responsible City organization.
Resolution 37680 also directed or authorized studies, committees and strategies to inform a path forward.This resolution contains recommended next steps for the City's Future of Large-Scale Performing Arts venues work.
The resolution directs City staff to work with external partners to advance a new Broadway-capable venue with approximately 3,000 seats as part of the proposed Performing Arts + Culture Center at Portland State University, and initiate planning for the future of the Keller Auditorium as a 1,200 to 1,800-seat venue.
Stabilized demand projections for both scenarios estimate total spending in today's dollars including indirect and induced spending, is estimated at $95.5 million for a new venue at Portland State University, compared to $82.5 million for a renovated Keller, an increase of 16 percent at the Portland State University site.This resolution directs City staff to work with external partners to advance a new Broadway-capable venue at Portland State University while simultaneously planning for the future of the Keller Auditorium as a renovated 1,200 to 1,800-seat venue.
This resolution directs the Deputy City Administrator to commit staff resources to complete pre-development functions in collaboration with Portland State University.This resolution also directs the Deputy City Administrator to direct staff to begin planning for the future of the Keller Auditorium, including community engagement, market study, financial analysis, and initial design work, the cost of which is to be determined.Existing staff capacity should be sufficient to advance this work over the coming months.This resolution does not itself have immediate and significant direct financial impacts for the City.
Timeline
- SOURCE UPDATED
Referred to City Council as amended on August 11, 2026 by City Life Committee
- DOCUMENT PUBLISHED
Referred to City Council as amended on August 11, 2026 by City Life Committee
- Council Action
Referred to City Council as amended
- Council Action
Continued